For a §48E credit, the placed-in-service date sets the credit year, the buyer's year under §6418(d), the start of five-year §50 recapture and, for wind and solar, whether the statutory deadline was met. Property is placed in service when it is ready and available for its specifically assigned function (Treas. Reg. §1.46-3(d)(1)(ii)). Buyers typically ask for completion and commissioning records, grid approval, permits, ownership documents, the IRS registration number and construction-start evidence. Confirm with your CPA and counsel.

For a §48E clean electricity investment credit, the placed-in-service date is the date that matters most. It sets the tax year the credit belongs to, which year a buyer uses it in, when the five-year recapture clock starts and, for wind and solar, whether a project beat the statutory deadline. This page is a buyer-side checklist of the evidence a CPA or counsel typically asks a seller to show before a §6418 purchase closes. It is educational, not legal or engineering advice, and the seller's own advisors are responsible for the claim.

Why the placed-in-service date matters to a buyer

  • Credit year. The §48E credit is determined for the taxable year in which the qualified facility or energy storage technology is placed in service (§48E(a)).
  • Buyer's year. The buyer takes a purchased credit into account in its first taxable year ending with or after the seller's taxable year for which the credit was determined (§6418(d)).
  • Recapture clock. Investment credit recapture under §50(a) runs for five years from the placed-in-service date, stepping down 20 points a year. For a §6418 transfer, recapture generally falls on the buyer (Treas. Reg. §1.6418-5).
  • Wind and solar deadline. After the 2025 legislation, wind and solar facilities must begin construction by July 4, 2026 or be placed in service by December 31, 2027 (see solar and wind deadlines).
  • Foreign-entity rules. Material-assistance rules apply to facilities beginning construction after December 31, 2025, so the construction-start date matters as much as the placed-in-service date (see FEOC risk).

What "placed in service" means

For investment credit purposes, property is placed in service when it is placed in a condition or state of readiness and availability for a specifically assigned function (Treas. Reg. §1.46-3(d)(1)(ii); IRS Publication 946 uses similar wording for depreciation). For power facilities, IRS rulings have looked at factors such as whether necessary permits and licenses were obtained, whether pre-operational testing was finished, whether the taxpayer had control of the facility, whether it was synchronized to the grid and whether it was operating on a regular basis. No one document settles the question; it is a facts-and-circumstances test that the seller's advisors should document.

Checklist: evidence to request

ItemWhat it showsAsk for
Completion certificatesConstruction finishedMechanical and substantial completion certificates signed under the EPC contract
Testing and commissioningFacility tested and ready for its functionCommissioning and performance test reports; independent engineer sign-off if one was engaged
Grid and utility approvalsSynchronized and allowed to operatePermission-to-operate or interconnection approval letter, and the commercial operation notice
Permits and licensesLegally able to operateFinal operating permits and any conditions still open
Ownership and controlThe seller owned the property when placed in serviceTitle, purchase or lease documents and entity chart; confirm the seller is the taxpayer that will register and elect
Cost basis supportAmount of the qualified investmentCost segregation or basis report and the invoices behind it
IRS registrationPre-filing registration done for the credit propertyRegistration number for each credit property, valid for the tax year (Treas. Reg. §1.6418-4)
Construction startDeadline and FEOC statusBeginning-of-construction memo and evidence (physical work or safe-harbor costs)
Bonus supportThe rate being sold is supportableWage and apprenticeship records, energy community and domestic content support (see bonus credits)
Operating historyFacility is running as expectedMonthly generation or availability data since the placed-in-service date

If the seller claims the low-income communities bonus (§48E(h))

§48E(h) adds 10 or 20 percentage points for certain facilities under 5 MW (AC) that receive a capacity allocation from the IRS program. The November 2026 IRS FAQs (Fact Sheet 2026-15) clarify points a buyer should check:

  • Size. Facilities with a maximum net output of 5 MW (AC) or more are not applicable facilities. For allocations beginning in 2026, a facility with larger inverters may qualify only if the inverters are permanently power-limited by the manufacturer, shown by a manufacturer letter or a professional engineer's stamped certification.
  • Who reports placed in service. Only the taxpayer that owned the facility when it was placed in service may complete the placed-in-service report in the IRS portal; no one may file it on another taxpayer's behalf.
  • Ownership changes. If ownership changed before the facility was placed in service, the new owner must request and receive IRS approval of an Allocation Transfer Request before filing the placed-in-service report. A transfer is not available if the original owner already placed the facility in service, and an allocation cannot be transferred to a disregarded entity.
  • Business property only. Facilities at a homeowner's personal residence do not qualify.

Ask for the allocation award, confirmation that the placed-in-service report was accepted in the portal by the correct owner, any approved Allocation Transfer Request, and the seller's covenants on the bonus. The statute directs Treasury to provide for recapture of the bonus amount if property stops qualifying, so the transfer agreement should address who bears that risk (see agreement terms).

Red flags

  • A placed-in-service date that falls in the last days of December with no testing or grid approval to support it.
  • Different dates in the registration, the cost report and the transfer agreement.
  • A seller entity that did not own the facility on the placed-in-service date.
  • For a §48E(h) bonus, a placed-in-service report filed by someone other than the owner on that date.

Any of these deserves a call with your CPA and counsel before you sign. The full buyer checklist is on the diligence and recapture page.

Educational information only, not tax, legal, accounting or investment advice, and no outcome is promised. Rules were checked against the cited sources on November 16, 2026; they change, so confirm with your CPA and counsel before acting. Veritas does not offer or solicit investments, does not prepare tax returns and does not guarantee a discount, savings or eligibility. See our disclaimer.

Frequently asked questions

Why does the placed-in-service date matter when buying a §48E credit?

It determines the taxable year for which the credit is determined (§48E(a)), the buyer's year for using it (§6418(d)), when five-year recapture under §50 starts, and for wind and solar whether the project met the statutory deadline.

What does placed in service mean for an energy facility?

Property is placed in service when it is in a condition or state of readiness and availability for a specifically assigned function (Treas. Reg. §1.46-3(d)(1)(ii)). IRS rulings for power plants have looked at permits, completed testing, control, grid synchronization and regular operation.

What documents should a buyer request?

Typically completion certificates, commissioning and test reports, a permission-to-operate or interconnection approval, final permits, ownership documents, a cost basis report, the IRS registration number for each credit property, construction-start evidence and support for any bonus rate.

What changed for the low-income communities bonus in November 2026?

IRS Fact Sheet 2026-15 (IR-2026-139) answered questions on the §48E(h) program: facilities of 5 MW (AC) or more do not qualify, with a limited 2026 exception for permanently power-limited inverters; only the owner at placed-in-service may file the placed-in-service report; and ownership changes before placed in service need an approved Allocation Transfer Request.

Who bears recapture if the facility is sold or stops qualifying?

For investment credits transferred under §6418, recapture generally falls on the buyer, and the seller must notify the buyer (Treas. Reg. §1.6418-5). Buyers usually negotiate covenants, indemnities or insurance.

Can Veritas confirm a project's placed-in-service date?

No. Veritas provides education and transaction support. The seller and its advisors are responsible for the claim, and your CPA and counsel should review the evidence.

Request a quote or call back

By submitting, you agree to our Privacy Policy. This isn't a commitment to buy, and we don't give tax advice.

Related guides